Kenyans who draw water for commercial and large-scale activities have until April 15, 2027, to install smart water meters, the Water Resources Authority (WRA) has announced.
In a notice issued on Tuesday, November 24, the authority said the deadline applies to all Category B, C and D water users, including those who draw water from rivers, dams and other sources or discharge wastewater.
WRA said the requirement is part of the Water (Resources) Regulations, 2025, which took effect on March 7, 2025.
The new rules require affected water users to install smart meters to help the authority keep track of how much water is being used across the country.
The meters will record water consumption and send the information to WRA’s monitoring system. This is expected to make it easier to monitor water use, improve accountability and reduce wastage.
The authority said the devices would also support fair billing by ensuring that charges are based on the actual amount of water used.
Under Regulation 73 of the 2025 rules, WRA is required to publish technical guidelines to help water users and manufacturers choose meters that meet the required standards.
An Application Programming Interface (API) has been provided by the authority, which will enable the meters to transmit data directly into the authority’s system.
WRA cautioned that consumers should not purchase any smart meter, since it should satisfy the required technical specifications and connectivity with the authority’s system.
Users have been urged to confirm the approved vendors and the technical specifications through the smart meter vendor portal or the official website of the authority.
In addition, the authority has highlighted the four steps for installation of the meter.
First, consumers should procure the meter that is compatible with WRA’s system and subsequently install it in the approved water abstraction or discharge point.
Second, the vendor or installer should integrate the meter into the system using the API and finally an officer of the authority should inspect and seal it.
According to WRA, water users and suppliers need to adhere to the requirements to ensure proper functionality and transmission of information from the meters.
Deadline for April 15, 2027 gives affected users adequate time to acquire and install the meters.










